A global biotech company’s equipment was aging and needed upgrades. Their market exploded over the last few years resulting in the manufacturing facility to be at full capacity. They could not afford a shutdown to upgrade their equipment for both increased throughput and modernization.
Practical Applications developed a detailed design and plan to build parallel systems to increase throughput and modernize their equipment. The new systems were built completely and verified prior to cutting over. No shutdown was required and the equipment now is operating well; allowing the client higher throughput, decreased chemical consumption, decreased maintenance, and higher reliability.